Insights · Guide

Before You Build

A plain-language guide to working with an architect, from your first idea to the day construction finishes.

Most building problems start long before construction, with an unclear brief, a budget nobody tested or drawings that contractors read differently. A good design process prevents them. This guide explains how that process works, what you should prepare, and what you will decide at each step.

1. Prepare these before your first meeting

You don't need drawings to start. You need clear answers to a few questions, because every design decision builds on them.

  1. Your construction budget. Give a realistic figure for the building itself. It shapes size, structure and materials more than anything else.
  2. The type of building. For example, a private house, villas for rent, a hotel or a commercial building.
  3. How it will be used. Who uses which spaces, when, and how the inside and outside connect.
  4. Your land. The title deed, plot size, a survey if you have one, and photos of the site and its access road.
  5. Who it is for. For a project you will sell or rent, describe the target buyers or guests: age group, lifestyle and occupation.

2. The six stages of a project

Design moves from big decisions to small ones. Each stage ends with a review and your written approval before the next one begins. This protects you: you never pay for detailed work on an idea you haven't agreed to.

Indicative durations, counted from your approval of the previous stage. Construction support lasts as long as the construction contract.
01

Pre-Design

15 days

The architect listens first. Together you pin down your budget, the type of building, how it will be used and who it is for. The architect then presents three different concept directions so you can choose a path before any drawing begins.

You decide
Which concept direction to develop
You receive
Concept booklet and detailed concept booklet
02

Schematic Design

45 days

The chosen concept becomes a real layout, developed in three rounds of about 15 days, with your review after each round. The site and the planning rules are analysed, massing options are modelled in 3D, and engineers set the direction for structure, air-conditioning and electrical systems.

You decide
Layout, building shape and area mix
You receive
Site analysis, master plan, floor plans, 3D views, area list, first cost estimate
03

Design Development

30 days

The approved layout is refined in detail and coordinated with the structural, mechanical and electrical engineers. This is where materials are chosen: floors, walls, ceilings, sanitaryware, lighting, doors and windows.

You decide
Materials and the look of the building
You receive
Detailed plans, elevations, sections, general specification
04

Construction Drawings

60 days

The complete drawing set is produced: architecture plus structural, mechanical, electrical and sanitary engineering. These drawings are what you submit to the authorities to apply for a building permit.

You decide
Final design for permit submission
You receive
Permit drawings for every discipline
05

Bidding

60 days

The permit drawings become a tender package so contractors can price exactly the same scope. It includes a detailed construction cost, a material specification and a blank bill of quantities (BOQ) for each bidder to fill in.

You decide
Which contractor to appoint
You receive
Bidding drawings, detailed cost, specification, blank BOQ
06

Construction Support

Length of build

Contract drawings are prepared for your agreement with the contractor. During construction the architect inspects the work, reviews the contractor's shop drawings, reports progress and certifies work completed.

You decide
Questions and changes on site
You receive
Contract drawings, BOQ, specification, progress reports

3. The rules that shape your design

Two things limit what can be built on any plot: the site itself and the law. A professional analyses both early in Schematic Design, so the design you fall in love with is one you can actually build.

The site

  • Orientation, sun and wind
  • Topography and slope
  • Climate and environment
  • Access, traffic and pollution
  • Existing trees and structures
  • Views, neighbours and nearby landmarks
  • Energy use

Planning law and building code

  • Planning zone of the plot
  • Floor Area Ratio (FAR): total floor area allowed
  • Open Space Ratio (OSR) and building coverage
  • Required green area
  • Maximum building height
  • Minimum setback distances
  • Slope limits for construction

4. What is included, and what is extra

A standard architectural service covers architecture plus the core engineering: structure, mechanical (air-conditioning and ventilation), electrical, and sanitary systems. Some projects need more. These services are usually agreed and priced separately, so ask about them at the start.

Optional serviceWhen you may need it
Civil engineeringSite roads, drainage and utilities, especially on large or sloping plots
Landscape designGardens, pools and outdoor spaces designed to fit the building
Interior designFitted interiors, furniture and finishes beyond the general specification
Tender management and bid evaluationInviting contractors, issuing documents and comparing prices on your behalf
Construction contract draftingPreparing the agreement between you and the contractor
Detailed cost accountingTracking construction spending in detail during the build

5. How fees usually work

Professional fees are normally agreed as one total, then paid in instalments. Each instalment falls due when a stage, or a round within it, is delivered and approved. The largest share usually falls on the construction drawings, the most labour-intensive stage. Ask for the payment schedule in writing, and check that every instalment is tied to a clear deliverable.

6. Why the bidding stage matters

When contractors price from rough drawings, each one assumes something different. Their prices can't be compared, and the gaps often come back later as extra charges. A proper tender package fixes this. Every bidder prices the same drawings and specification, on the same blank bill of quantities, so you can compare offers line by line.

← All insights

Planning a resort, villa or school?

Tell us a little about the site and stage. We reply within 2 working days, in Thai or English.

WhatsApp QR code
WhatsAppScan to add us
and chat with the studio
WeChat QR code
WeChatScan to add us
and chat with the studio

Loading…